IMPLEMENTASI FAKTOR KEGAGALAN KINERJA PROYEK PADA PROYEK-PROYEK DI X PROYEK JAWA TIMUR

  • Hieka Wahyu Permana Universitas Airlangga
  • Aldo Lovely Arief Suyoso Universitas Airlangga
  • Tri Siwi Agustina Universitas Airlangga
Keywords: Project External Environment, Construction Material Supply Related Problem, Project Performance Failure, Ineffective Contract Management

Abstract

The types of projects include, public school building procurement projects, procurement of main transmission materials, relocation and various other projects. This infrastructure will support services for additional students for the next ten years so ​​that a comprehensive implementation of project performance failure management analysis is needed to be able to identify, analyze, evaluate, and respond to project failure risks so that project work runs well. The following is data related to the procurement of goods and services projects associated with monitoring results during the project.This study examines the effect of project external environment and construction material supply related problems on project performance failure through ineffective contract management on building construction projects. This study uses a quantitative method with SEM-PLS (Structural Equation Modeling) Partial Least Square analysis. The results of the study indicate that project external environment and construction material supply related problems affect project performance failure through ineffective contract management on building construction projects.

 

References

Alma. (2019). Manajemen Pemasaran dan Pemasaran Jasa. Alfabeta: Bandung.
Alubaid, F., Alhadeethi, R., & Alnajjar, E. (2018). Evaluating The Quality Control Related Factors To Engineering Defects In Construction Projects In Jordan. International Journal of Civil Engineering and Technology, 9(6):923-939.
Andersen, E., & Grude, K. (2017). Our Tributr To Rodney and The Importance Of Goal Directed Project Management. International Journal of Project Management, 36(1):1-4.
Gadisa, & Zhou. (2021). Exploring Influential Factors Leading To The Poor Performance Of Public Construction Project In Ethiopia Using Strcutural Equation Modelling Engineering, Construction And Architectural Management. International Journal Project Management, 28(6):50-65.
Ghozali. (2019). Analisis Smart PLS. Universitas Diponegoro: Semarang.
Hair, Christian, & Marko. (2019). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). SAGE : Melbourne.
Mahamid, & Ibrahim. (2018). Factors Contributing To Poor Performance In Constrcution Projects : Studies Of Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12(1):27-38.
Renja. (2024). Rencana Kerja Dinas Pendidikan Provinsi Jawa Timur. Dinas Pendidikan Provinsi Jawa Timur: Surabaya.
Sinesilassie, E., Tabish, & Jha, K. (2018). Critical Factors Affecting Cost Performance : A Case Of Ethiopian Public Construction Projects. International Journal of Construction Management, 18(2):1-12.
Sugiyono. (2019). Metode Penelitian Kuantitatif dan Kualitatif. Alfabeta : Bandung.
Published
2024-10-26
Abstract viewed = 0 times
pdf downloaded = 0 times