RISK ANALYSIS AND RISK MONITORING FOR PROJECT: CASE STUDY ON CONVEYOR CONSTRUCTION PROJECT
DOI:
https://doi.org/10.31539/krzr8t18Keywords:
Risk Management, Project Risk Management, Risk Identification, Risk Analysis, Risk Monitoring, ISO 31000:2018, Top Risk, Key Risk IndicatorsAbstract
PT Bukit Asam Tbk has ambitious production and sales targets for its long-term planning. Meanwhile, research shows that coal prices tend to be stable and declining, while oil prices tend to rise. The condition requires PTBA to maintain control over production costs and maximize profits. To improve production efficiency, reengineering is necessary to achieve the lowest possible production costs while maximizing output. One of PTBA’s efforts to improve production efficiency is the construction of an in-mine conveyor, a solution for coal handling, which currently relies on trucking for this route. Ensuring sufficient capital expenditure is crucial to project success. In addition to commitment from all parties, consistent risk management is also necessary to identify and mitigate potential risks that could derail project objectives. However, it is understood that, under current conditions, the project’s risk management practices are not yet integrated or comprehensive. A gap analysis was conducted to assess the effectiveness of PTBA’s current project risk management implementation, comparing it with international standards (ISO 31000:2018) and PTBA procedures. The study revealed that risk management in the PTBA project was not yet well established, as evidenced by risks not identified in the initial risk list. The risk analysis process was not comprehensive, as evidenced by the continued reliance on qualitative expert assessments despite the availability of quantifiable data. Furthermore, risk prioritization was not carried out, leading to all risks being mitigated, even those considered low or low to moderate, and a lack of focus on significant risks. Furthermore, monitoring for the conveyor project within the mine was inconsistent. Recognizing this alignment, a re-identification was conducted by first compiling an analysis document of the project’s internal and external factors using the 5M (People, Machines, Methods, Money, Materials) and PESTEL (Political, Economic, Social, Technological, Environmental, and Legal) analysis. A risk analysis of the conveyor project’s risk levels within the mine was conducted, specifically calculating their impacts and simulating them in a financial model to determine the project’s NPV and IRR. Next, risk prioritization was undertaken to identify the Project’s Key Risks. Furthermore, a mitigation plan was developed, including the Project Implementation Unit (PIC), outputs/deliverables, and timeframe. In addition, key risk indicators (KRIs) are designed to provide early warning signs for each risk. Routine monitoring of these Key Risks is planned at least once a month, with more frequent monitoring if needed.
References
Bai, L., Zhang, L., Zhang, L., Shao, K., & Luo, X. (2025). Unlocking the potential of project portfolio: Value-oriented interactive risk management. Humanities and Social Sciences Communications, 12, Article 1012. https://doi.org/10.1057/s41599-025-05296-8
Browning, T. R. (2019). Planning, tracking, and reducing a complex project’s value at risk. Project Management Journal, 50, 71–85.
Hubbard, D. W. (2009). The failure of risk management. New York, NY: Wiley.
International Organization for Standardization. (2018). ISO 31000: Risk management - Guidelines.
Ling, P.-L., Lye, C.-H., & Lee, C. (2022). Is bank risk appetite relevant to bank default in times of COVID-19? Central Bank Review, 22(3), 109–117. https://doi.org/10.1016/j.cbrev.2022.08.003.
Ministry of State-Owned Enterprises of the Republic of Indonesia. (2023). Regulation of the Minister of State-Owned Enterprises No. 2 of 2023 on the governance and implementation of risk management in state-owned enterprises. Government of Indonesia
Ministry of State-Owned Enterprises of the Republic of Indonesia. (2023). Decree of the Deputy for Finance and Risk Management of the Ministry of State-Owned Enterprises No. SK-6/DKU.MBU/10/2023 on technical guidelines for the risk management process and aggregation within the state-owned enterprise portfolio risk taxonomy. Ministry of State-Owned Enterprises.
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® guide) (7th ed.). Project Management Institute. International Organization for Standardization.
PT Bukit Asam Tbk. (2024). Annual report 2024. PT Bukit Asam Tbk.
PT Bukit Asam Tbk. (2023). Risk management guidelines. PT Bukit Asam Tbk.
PT Bukit Asam Tbk. (2024). Program and project governance guidelines (Internal guideline). PT Bukit Asam Tbk.
PT Bukit Asam Tbk. (2025). TCK Monitoring Key Risk Indicator. PT Bukit Asam Tbk
PT Bukit Asam Tbk. (2024). Tata Laksana Penetapan Lingkup, Konteks, Kriteria. PT Bukit Asam Tbk.
PT Bukit Asam Tbk. (2025). TCK Identifikasi Risiko. PT Bukit Asam Tbk.
PT Bukit Asam Tbk. (2025). TCK Analisis Risiko. PT Bukit Asam Tbk.
PT Bukit Asam Tbk. (2025). TL monitoring Pengendalian Risiko. PT Bukit Asam Tbk.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Prilly Febi Pratiwi, Taufik Faturohman

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.